Browse by Tags

  • Look me in the eye!

    (A short rant about eye-contact-based specifications.) In short, there is no such things as an eye-contact-based specification. And for a reason. While kicking-off of a project, we had a discussion with the customer about the change management approach, and specification detail. I was insisting on documenting...
    Posted to Navigate Into Success (Weblog) by Anonymous on 11-27-2008
  • Diagnostic Phase – a signpost for implementation

    Each phase of Microsoft Dynamics Sure Step methodology is equally important in an implementation project. You could argue that analysis is the most important, or that design is the most important, or that operation is less important. I’ll paraphrase Scott Adams here and ask: how one phase can be...
    Posted to Navigate Into Success (Weblog) by Anonymous on 09-18-2008
Page 1 of 1 (2 items)