Why Planners Benefit From Visual Scheduling That Allows Grey Areas

My experience from working with many SMB companies around the globe tells me that even the best (and probably most expensive) production planning model never can cope with reality: data always seems to be too imperfect to feed the “perfect” algorithm and the current production conditions seem to change too fast so that systems always seem to be ‘behind’ the shop floor reality. In that regard, a scheduling grey area should be defined as the area in which the scheduling system’s settings, configuration and model does not meet the reality and in which a human scheduler is sitting in the driver seat with the need to make agile decisions.

In this blog post I talk about how a visual scheduling approach can help the driver to navigate through the scheduling grey area,