Hi Mayouni,
To add to Subra's point on volume: which direction is slow, turning budget control on or off? The two do very different work!
Turning it on only validates that there's an active configuration and sets a flag on the ledger. Turning it off also removes the draft budget tracking of all unposted documents in that ledger and then runs the budget check processing to update tracking and summary data, all in a single transaction. With many open or abandoned drafts (old requisitions, purchase orders, unposted journals), that's a lot of work in one transaction, and when it fails, everything rolls back, so the next run starts from scratch.
By experience, here's what I would look at:
1. Why it's being turned off. Microsoft advises against turning budget control off mid-year once transactions are posted, because posted documents may no longer relieve correctly afterwards. Configuration changes don't need it: create a draft of the budget control configuration and activate it.
2. If you do need to turn it off, clean up drafts that are no longer needed first, and run it in a quiet window so other budget checks don't compete for the same tables.
Reference on Microsoft Learn:
https://learn.microsoft.com/dynamics365/finance/budgeting/budget-control-overview-configuration
Kind regds,
Patrick