The scenario.
- PTO accrues for each employee every 2 weeks.
- The biweekly accrual crosses calendar years. (12/25/08 thru 1/8/09, this is reflected as 2009 PTO)
- Prior year PTO can be taken during during the 2008 portion of the cross over accrual period. (12/29/08-12/31/08)
Is there a setup configuration by which the 2008 PTO activity and the 2009 PTO activity can be reported separately by year when a crossover period is involved?
*This post is locked for comments