Where to maintain variable overhead cost ? is it in the Cost sheet ?
Does cost sheet link to Cost estimates & costings ?
What if there are several resources maintain per site, how can this be maintain on cost sheet?
e.g. Ste A - Resources 1, 2,3, (each maintain different variable overhead cost)
*This post is locked for comments