Hi Team,
Is it possible to block timesheet after specific period of time so that timesheet is not changed for some previous period.
Regards
Gaurav Virdi

Hi Team,
Is it possible to block timesheet after specific period of time so that timesheet is not changed for some previous period.
Regards
Gaurav Virdi
You can create a plugin or other automated logic that prevents creating time entries in the past but it needs to be designed and built from scratch in CE. So such feature in OOTB Proj Ops and I have not see in on the roadmap for 2022.