Since we upgraded to 2013 R2- our Mandatory arrears is not working like it had in the past. We have always used the Post Batches- and selected all Arrears templates to run our Deductions in Arrears. It has worked great in the past. However, now it does not work. Was there a change in 2013 R2 (we had 2013 before). If we run the Mandatory Arrears for a single deduction template then it works great. We have close to 200 deductions so this would take a long time to run for each one individually.
One thing that we noticed is that for the Arrears Template Setup window there is a "Check Date From". In the How-To it states that this will be updated when the Mandatory Arrears is run. However, this date has never changed from the date that we setup the Templates originally. (Even though this date did not update the Mandatory Arrears worked great until we updated to 2013 R2.)
Or maybe all of this is a result of this being our first payroll in 2015???? Any input is appreciated.
*This post is locked for comments