Suggested Answer

Scheduling Production Stations that contain Work Centers

(0) ShareShare
ReportReport
Posted on by 30

Hello,

Hope someone can point us I. The right direction.

We have a limited amount of production stations (locations) to assemble our products and during the creation of a production order we would like to be able to constrain that order to a certain amount of stations that can be used (for instance 5). If the production order is for 20 products, we would like to see the scheduling of 5 products being scheduled parallel (at the 5 stations allocated) and this being repeated 4 times (4x serial at each station).

At each station a sequence of steps will be executed to assemble our product within a few days, some of them by our own employees and some of them by subcontractors (all activities are at the station in our factory). Some steps have to be serial, some of them can be parallel.

Problem

If we define the production locations (the stations) as work stations, we can assign concurrent capacity on a routing line. It could schedule multiple assemblies at the same time but it will not:

  • 1- Schedule the individual stations (for instance A1, A2, A3, A4 and A5)
  • 2- Allow us to define our subcontractors as work centers (we can not assign a work center (subcontractor) under another work center (assembly station)

All advice is appreciated, Nico

  • Suggested answer
    Community Member Profile Picture
    on at

    Nico,

    On the Routing Line, if I have 5 people (stations) within my Work Center, under the field Concurrent Capacities if I enter 5 then all 5 people will work on the item in parallel. Subcontractor Work Centers can be created if you are sending the Routing step outside.

    Try this setup and you should see the processing capacity loads.

    Thanks,

    Steve

  • Suggested answer
    MahGah Profile Picture
    15,613 on at

    interesting point Steve. Do you mean if in one step we have like 10 people then we can set Concurrent Capacities as 10 and then this will assign 10 people to that step?

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Season of Sharing Community Challenge Winners!

Congratulations to our community stars!

Women in Power Builds Momentum

Expanding mentorship, skilling, and AI innovation

Leaderboard > Small and medium business | Business Central, NAV, RMS

#1
OussamaSabbouh Profile Picture

OussamaSabbouh 664 Super User 2026 Season 2

#2
YUN ZHU Profile Picture

YUN ZHU 446 Super User 2026 Season 2

#3
Teagen Boll Profile Picture

Teagen Boll 282 Super User 2026 Season 2

Last 30 days Overall leaderboard

Featured topics

Microsoft Training Manuals

Product updates

Dynamics 365 release plans