Does anyone know why when a production order status is changed from firm planned to release or release to finished whatever was in the priority field changes back to normal. Is this the default of the program and can this be changed to stay the same thru out the flow? We mark this coluum for different flow processes thru the shop and would like to be able to track items using this.
Thanks
*This post is locked for comments