We have a multi-site environment using Master scheduling. Storage dimensions are setup for mandatory site, non-mandatory warehouse. The Production BOM only has Site no warehouse.
When running Master scheduling and doing an explosion the production BOM explosion always shows a shortage for the BOM lines. There is on-hand quantity at the Site/Warehouse. Does AX look at the Site level to see what is on hand? My question is, that I would like to get verification on, does the BOM require a warehouse for each BOM line?
Thanks.
*This post is locked for comments