On the Work Order Service record, there are two fields: Duration, and Duration to Bill.
They are two separate fields in the database. When I change one, the other is updated to the same value.
Why are there 2 fields on the form by default if they always stay in sync? Can this behavior (keeping them in lock-step) be changed?
Ultimately, the user wants to capture the actual time it took to do the work as a separate value from the time they will bill the client.