Dear
I did all the setup regarding the Grant Management ,
1. Created a grant in the Grant Maintenance , and linked it to a Dimension
2. Checked the Validation Options that i wanted
3. I entered AA budget for that dimension
but when i when to do a transaction that was over budget , i didn't get stopped by the system.
Am i missing something in the setup?
thanks
*This post is locked for comments