When you have a complex or long running production process you might have a large number of raw materials that could be required at different steps through the production process. So when you setup your BOM and Route you can link the BOM lines to specific operations.
Here is a quick overview.
AX2012 R3 CU11
In a follow-up video we’ll have a look at how to mange the pick lists at difference stages through the operations.
Cheers
Lachlan
Filed under: Production control

Like
Report
*This post is locked for comments