Route re-use with different resource for specific operations

Lachlan Profile Picture Lachlan

In a previous post we had a look at route re-use which can save time setting up data. Let’s say you have commonality with the number of operations that the products need to go through but in one operation you might use a different resource. For example you have multiple stamping machines that have die in them to punch a different pattern of holes for different models of products. You can setup this up in AX with an operation relationship to the different products.

Here is a quick overview.

AX2012 R3 CU11

Cheers

Lachlan


Filed under: Production control