Setting multiple resources on a route operation
When setting up routes there might be an operation step that requires multiple resources to perform the work. This is a quick walk through assigning number of resources to the operation.
Cheers
Lachlan
Filed under: Production control, Supply chain planning

*This post is locked for comments