web
You’re offline. This is a read only version of the page.
close
Skip to main content

Notifications

Announcements

Community site session details

Community site session details

Session Id :

How to use the vendor production order in Dynamics 365 for Finance & Operations, Enterprise

David Gumpert Profile Picture David Gumpert 1,290

The following business scenario is common: I send my materials to a subcontractor, he assembles, tests, paints, etc. and returns a completed assembly to me. The emphasis is on "My materials" and "Vendor labor". This scenario can be called a form of contract manufacturing. It is more than likely that this assembly is my design, so the vendor gets a drawing and work instructions.  This could be a permanent situation or it could be triggered by an overloaded shop floor that needs to outsource some of the work.

How would we handle this scenario in Microsoft Dynamics 365 for Ops (D365FOE) or any older AX version? I think the basic setup is described in the 2012 and older production manuals. It is not hard, although it seems unusual doing it the fi...

read more


This was originally posted here.

Comments

*This post is locked for comments