Hello
I have 2 questions on BC which I hope somebody can help with please.
1. Is there any way to set up the planning worksheet to run automatically over. EG perhaps on a batch job something like that If yes how can it be set up with filters etc.
2. Is there any audit trail to show that the low level code has been run and has history associated with it. Generally calculate low level code job is kicked off but it doesn't produce any type of output and doesn't really give any confidence that it has completed.. therefore I have no idea whether it has been successful or not. I am having some trouble with the planning worksheet in that It doesn't produce production orders for all the sub assemblies under a given Bill of Materials and therefore I don't know if there is a problem potentially with the low level code but I can't really check it if it has not executed properly.