Hi everyone,
I'm experiencing an issue with the capacity cost calculation in BOM Cost Shares for an operation with Setup time when using a work center with Unit cost calculation = Time .
I have the following product with a lot size of 1,000 units:
Its production route is as follows, where it can be seen that the lot size for operation 030 is 500 units and it has a setup time of 1 HOUR:
The work center card where operation 030 is performed is as follows, with a direct unit cost set to 37.10 €/HOUR.
Therefore, since the required capacity per unit is 1,000 UNIT / 500 UNIT × (1 HOUR / 1.000 UNIT) = 0.002 HOUR, the capacity cost should be 0.002 HOUR × 37.10 €/HOUR = 0.0742 €, not 0.0371 € as shown in the BOM Cost Shares. I don't understand why the unit cost is 18.55 € instead of 37.10 €.
Has anyone else experienced this behavior? Is this a known limitation or a configuration issue? Any insights or workarounds would be greatly appreciated.
Thanks in advance!