Suggested Answer

Req. Worksheet and Purchase Order

(0) ShareShare
ReportReport
Posted on by 78

Hi Gurus!

I'm running into an issue with my business central req. worksheets. 

I keep getting a cancel and to place a new order. 

When we contact the vendor the items are already on their way so canceling is not an option.

How can we make it so that the req worksheet acknowledges that the PO will be filled?

Much appreciated! 

I have the same question (0)
  • Suggested answer
    Teddy Herryanto (That NAV Guy) Profile Picture
    14,302 Super User 2026 Season 1 on at

    Check the Dampener Quantity and Dampener Period on the Item card. It can stop BC to suggest from canceling the order.

    Dampener Period: Specifies a period of time during which you do not want the planning system to propose to reschedule existing supply orders forward. The dampener period limits the number of insignificant rescheduling of existing supply to a later date if that new date is within the dampener period. The dampener period function is only initiated if the supply can be rescheduled to a later date and not if the supply can be rescheduled to an earlier date. Accordingly, if the suggested new supply date is after the dampener period, then the rescheduling suggestion is not blocked. This field is enabled if Reordering Police is set as Order or Lot-for-Lot.

    If the lot accumulation period is less than the dampener period, then the dampener period is dynamically set to equal the lot accumulation period. This is not shown in the value that you enter in the Dampener Period field.

    Dampener Quantity: Specifies a dampener quantity to block insignificant change suggestions for an existing supply if the quantity by which the supply would change is lower than the dampener quantity. If the suggested change in quantity is higher than the dampener quantity, then the suggestion is not blocked. If this field is empty, then the value in the Default Dampener Quantity field in the Manufacturing Setup window applies.

  • O3I Profile Picture
    78 on at

    Thanks Teddy,

    This answers part of my problem.

    Is there a way in the req worksheet to ignore lead times and acknowledge any open PO's? Our PO's don't have the greatest lead times which is why we are running into an issue with the req worksheet.

    Much appreciated! 

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Introducing the 2026 Season 1 community Super Users

Congratulations to our 2026 Super Stars!

Meet the Microsoft Dynamics 365 Contact Center Champions

We are thrilled to have these Champions in our Community!

Congratulations to the March Top 10 Community Leaders

These are the community rock stars!

Leaderboard > Small and medium business | Business Central, NAV, RMS

#1
OussamaSabbouh Profile Picture

OussamaSabbouh 1,922 Super User 2026 Season 1

#2
YUN ZHU Profile Picture

YUN ZHU 1,078 Super User 2026 Season 1

#3
Khushbu Rajvi. Profile Picture

Khushbu Rajvi. 628 Super User 2026 Season 1

Last 30 days Overall leaderboard

Featured topics

Product updates

Dynamics 365 release plans