I am wondering if there is a way to Create/Select an Alternate Routing when creating a Work Order for an Item. I come from background working with Oracle and am still fairly new to using Business Central. In Oracle, you can create a Master Routing that is attached to a Master Item. However if you can run a part through a alternative process (i.e. assembly by hand instead of on machine), you could create a 2nd Master Routing and give it an "Alternate" tag via a dropdown box. That way when you create a new Work Order for an Item, you had a drop down box for Alternate Routing. Leave it alone, the Master Routing was chosen, or select "Alternate" in the drop down and you could use the Alternate Routing instead (the same was possible for Alternate BOMs as well).
However I have not been able to find an option to create an Alternate Routing like this in Business Central. Can anyone possible help me in this process? Or is this something not doable in Business Central?