Hi
We know that we can assign one BOM line item to one operations in the routing
But requirement is one BOM item is required in more than one operation
Example for the FG we have BOM line item 1, BOM line item 2, BOM line item 3, BOM line item 4. this FG routing have 5 operations 10, 20, 30 ,40 and 50.
The BOM line item 2 is required in the operation 20, 30 and 50.
Help us how can we do this
Thanks in advance