Hi,

I installed Analysis Cubes for a client but there is a problem with the date fields as they are all displaying "Unknown".  I have tried redeploying the cubes but this has not solved the problem.    I can see the dates in the database.

What could be causing this ?

Thanks

*This post is locked for comments

I have the same question (0)
  • Leahs Profile Picture
    on at

    Is the Master Package Job running successfully? 
    Try manually running the package and verify it completes without error.   To run the Master pack in SQL Server Management Studio > connect to Integration Services > Stored Packages > MSDB > Dynamics GP Warehouse > Right click on the job ending in Package_Master > Run Package > Execute
    If an error is returned please reply back with screen shots of all the errors returned.  The last error message returned when the job completes will state the package has failed.  You will need to scroll up in the Package Execution Process Window to see the originating error(s).

     

  • Verified answer
    Redbeard Profile Picture
    12,931 on at

    Tracy,

    I encountered the same problem after installation.  I went through and redeployed the cubes as well, and experienced much the same result.  

    First, I checked BIDS, and was able to validate I had data in the tables by Double Clicking on the Cubes, Opening the Cube Structure, then Right Clicking on various tables and selecting Explore Data (this previews the tables) - you should see data in Dimensions.  If you can do this, then you know the data is not the problem.

    After validating the data was not the problem, I connected to the Microsoft Analysis Server, then Right Clicked on the Dynamics GP Analysis Cubes at the top level and select Process, then click OK.   This refreshed the Entire Analysis Cube Structure.  I was then able to go into Excel and click Refresh Data, and the Unknowns disappeared.

    I really hope this works for you as well.

  • adeel333 Profile Picture
    487 on at

    Harry Lee I have the same problem. Analysis cubes GP 2010 and all of my Dates dimension showing UNKNOWN. I have went through your recommended solution but unable to resolve the issue. All other dimensions are showing accurate data. Please help.

  • Suggested answer
    adeel333 Profile Picture
    487 on at

    Finally it worked for me.

    redbeardblogging.blogspot.com/.../dynamics-gp-analysis-cubes-deployment.html

    Everything is working fine now :)

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Responsible AI policies

As AI tools become more common, we’re introducing a Responsible AI Use…

Neeraj Kumar – Community Spotlight

We are honored to recognize Neeraj Kumar as our Community Spotlight honoree for…

Leaderboard > 🔒一 Microsoft Dynamics GP (Archived)

#1
mtabor Profile Picture

mtabor 1

Last 30 days Overall leaderboard

Featured topics

Product updates

Dynamics 365 release plans