In the Solomon Bill of Material Module the Effective End date is incorrect and locked out (shaded gray). Is there a way to correct this date?
*This post is locked for comments
In the Solomon Bill of Material Module the Effective End date is incorrect and locked out (shaded gray). Is there a way to correct this date?
*This post is locked for comments
Use Apply Date-Effective Revisions (11.500.00) to activate or deactivate bills and components based on the corresponding start and stop dates. This process implements all changes scheduled to occur on the date you have entered.
Effective Date specifies the desired system cutoff date for this process. If a bill of material, component, or routing with a pending status has a start date on or before the effective date, then the Apply Date-Effective Revisions (11.500.00) process makes the selected record active. If a bill of material, component, or routing with a status of active has a stop date on or before the effective date, the process makes the selected record obsolete.
Thanks
André Arnaud de Cal...
292,516
Super User 2025 Season 1
Martin Dráb
231,409
Most Valuable Professional
nmaenpaa
101,156