web
You’re offline. This is a read only version of the page.
close
Skip to main content

Announcements

No record found.

News and Announcements icon
Community site session details

Community site session details

Session Id :
Supply chain | Supply Chain Management, Commerce
Suggested Answer

Work templates work break by license plate

(0) ShareShare
ReportReport
Posted on by 535

Hi

does anyone know if a way exists to break work by located license plate? This is for sales work

I have a specific location that we want to scan many lps of the same lp to. ii have multiple lp in one location, so want each lp to be its own work. It has to lp controlled as the put location is the final shipping location. 

Grouping by license plate or located lp doesn’t seem to work for me on the grouping?

I have the same question (0)
  • ColbyGallagher Profile Picture
    3,668 on at

    Is your LP a fixed conversion to the stocking unit of measure?  If so, on your work template, set a "work header maximum->Maximum number of pick lines" of 1 AND a "maximum" of either quantity = 1 of your pallet / LP unit in the Unit field, or slide the "packing quantity as maximum"

  • tl82 Profile Picture
    535 on at

    Hi Colby

    unfortunately the quantity per lp is not standardised and could be more or less than a full pallet of the item. It’s more likely to not be standard conversion to pallet than anything else. This is just based on the specific scenario which is too detailed as to why to explain here, and actually not relevant to what is required from the system.

    I suspected that I cannot break the work by LP so I think you are pretty much confirming this here.

  • Suggested answer
    Mehdi AMRANI Profile Picture
    1,422 on at

    Hi tl82,

    In Standard there is no possibility to break works by LP as the reservation is done on the third level of reservation hierarchie (Site,Warehouse,Status)

    then you have 4 options:

    1 you sry to standardize you Ti-hi for by item and work with packing qty as a maximum in the work template.

    2 if the LPs are on racks, then if your locations in the system are reflating the physical locations then you can break works by locations.

    3 you can group the picking in the Mobile device menu items and then let the user brake them using the full button for saying that he can't lift more than the quantity mentioned.

    4 add a customization on the allocation wave step to assign a LP after assigning the location. (Will consume hugely the resources depending on your WHS layout)

    Kind Regards,

    Mehdi AMRANI

  • Suggested answer
    tl82 Profile Picture
    535 on at

    Thanks Colby and Mehdi confirms. What I thought

  • Mehdi AMRANI Profile Picture
    1,422 on at

    Hi tl82,

    So can you please verify the answers

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Introducing the 2026 Season 1 community Super Users

Congratulations to our 2026 Super Stars!

Meet the Microsoft Dynamics 365 Contact Center Champions

We are thrilled to have these Champions in our Community!

Congratulations to the April Top 10 Community Leaders

These are the community rock stars!

Leaderboard > Supply chain | Supply Chain Management, Commerce

#1
André Arnaud de Calavon Profile Picture

André Arnaud de Cal... 139 Super User 2026 Season 1

#1
André Arnaud de Calavon Profile Picture

André Arnaud de Cal... 139 Super User 2026 Season 1

#3
Laurens vd Tang Profile Picture

Laurens vd Tang 112 Super User 2026 Season 1

Last 30 days Overall leaderboard

Product updates

Dynamics 365 release plans