Hi All,
Can I change the Project default to Work Break Down Structure? So when a project entity opens it opens the WBS directly?
*This post is locked for comments
I have the same question (0)

Hi All,
Can I change the Project default to Work Break Down Structure? So when a project entity opens it opens the WBS directly?
*This post is locked for comments
I have the same question (0)