Hi all,
Batch order ended in date 12/31/2020 but system date 1/12/2021
New indirect cost in costing sheet setup with node type output unit based active from date 01/01/2020 .
So supposed in mentioned batch order no indirect cost posting because end date is before activation date of the indirect cost .
The issue when I open overview costing from Manage cost > calculation > view calculation details I found indirect cost in realized consumption Wrong calculation , it takes from the New indirect cost which active from date 01/01/2020.
I think this is because system date when I was make end batch order was 1/12/2021.
Note:
All production posting and indirect cost transactions is correct , just the window of overview costing shows wrong consumption. so any one face the same issue , what should i do ?
Same case as you, it does not seem to be controlled by the From date, it is recommended to create a support ticket in LCS.