web
You’re offline. This is a read only version of the page.
close
Skip to main content

Announcements

No record found.

News and Announcements icon
Community site session details

Community site session details

Session Id :
Supply chain | Supply Chain Management, Commerce
Suggested Answer

Stop wave processing in case work creation failed

(7) ShareShare
ReportReport
Posted on by 17
There is an option available in Wave template "Continue wave processing when work creation fails" which I understand is to control if wave processing needs to be stopped if work creation fails.
 
I have disabled this check box but still wave processing is continuing even though work creation failed for one of the shipment line.
 
Can anyone tell me how wave processing can be stopped i.e., stop creation of work for entire wave even if one line fails work creation.
I have the same question (1)
  • Suggested answer
    Holly Huffman Profile Picture
    6,554 Super User 2026 Season 1 on at
    Good morning, afternoon, or evening :) depending on your location!
     
    The issue you're encountering, where wave processing continues despite disabling the "Continue wave processing when work creation fails" option, could be due to specific configurations or system behavior in Dynamics 365 Supply Chain Management. Here are some steps and considerations to address this:
     
    1. Verify Wave Template Configuration
    • Double-check the Wave Template settings to ensure the "Continue wave processing when work creation fails" checkbox is indeed disabled.
    • Confirm that the wave template being used for the specific shipment line is the correct one and matches your intended configuration.
    2. Check Work Creation Failure Handling
    • Dynamics 365 may still process other lines in the wave if the failure is isolated to a single line. This behavior ensures that other valid lines are not delayed.
    • To stop the entire wave, you may need to implement custom logic or use a Wave Method that explicitly halts processing when any line fails.
    3. Review Wave Processing Logs
    • Check the Wave Processing Logs to identify why the system is continuing. Look for any errors or warnings related to the failed line.
    • Logs can provide insights into whether the failure is being treated as critical or non-critical.
    4. Use Wave Execution Notifications
    • Enable Wave Execution Notifications to monitor the status of wave processing. This can help you identify and address issues in real-time.
    5. Customization Option
    • If the out-of-the-box functionality does not meet your requirements, consider working with a developer to customize the wave processing logic. A custom method can be added to stop the wave entirely when any line fails.
    6. Test in a Sandbox Environment
    • Replicate the issue in a sandbox environment to confirm whether it’s a configuration issue or a system limitation.
    • Test with different wave templates and scenarios to identify patterns.
     
    Hope this helps!
  • Suggested answer
    Laurens vd Tang Profile Picture
    4,796 Super User 2026 Season 1 on at
    Good day,
     
    Have you configured a 'Location directive failure'?
     
    If not, could you configure one and activate the parameter 'Stop work on location directive failure'?
     
    Path: Warehouse management > Setup > Warehouse management parameters
     
    Best regards,
    Laurens van der Tang
  • AL-20032006-0 Profile Picture
    17 on at
    Thank you Laurens and Holly for your replies.
     
    We have configured the setup to stop work creation and this is the reason work is not getting created for that line but it is processing other lines and creating work.
     
    The main issue is that the behaviour is not consitant at all, some times the shipment is removed from the wave and some times it will change the status of the wave to released even though one or more lines are not processed in the wave.
     
    Regards,
    Akshay Lingala
  • Laurens vd Tang Profile Picture
    4,796 Super User 2026 Season 1 on at
    Hello Akshay,
     
    My suggestion is to raise bug with Microsoft. 
     
    Best regards,
    Laurens van der Tang

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Introducing the 2026 Season 1 community Super Users

Congratulations to our 2026 Super Stars!

Meet the Microsoft Dynamics 365 Contact Center Champions

We are thrilled to have these Champions in our Community!

Congratulations to the April Top 10 Community Leaders

These are the community rock stars!

Leaderboard > Supply chain | Supply Chain Management, Commerce

#1
André Arnaud de Calavon Profile Picture

André Arnaud de Cal... 164 Super User 2026 Season 1

#2
Laurens vd Tang Profile Picture

Laurens vd Tang 105 Super User 2026 Season 1

#3
Zain Mehmood Profile Picture

Zain Mehmood 89 Most Valuable Professional

Last 30 days Overall leaderboard

Product updates

Dynamics 365 release plans