Hi,
We have a complex structure of our product which results in a total of 12 low-level codes. When I run the MRP/MPS in the Planning Worksheet is only plans up to low-level code 10. It doesn't plan for low-level code 11 and 12 even though I'm short on hand.
Is there a limit of 10 or how can I make the program plan for the whole structure?