Hi,
Working with Business Central Saas, it sounds the Adjust Exchange Rate report is always recalculating all the previous entries, ignoring the Starting Date filed in the launch report.
For exemple, with the setup bellow, BC is still recalculating all the documents posted before the 01/10/2024. Any idea how to get it workable only for the period I choose?