Hi:
I cannot roll up standard cost for any Production BOMs, as I'm being told that the maximum number of levels (50) has been either reached or exceeded.
I'm surprised to find out that I have so many levels. There are only five BOMs, and they're each very simple.
I attempted running Low level Codes, after trying to rollup. But, I received the same message.
Am I not going to be able to roll up standard costs?
Thanks!
John
50 Levels is REALLY deep. The only thing I can imagine that could cause that is if you have a BOM as a grand-child of itself.
Try looking at the item Cost Shares page from Item | Related | Bill of Materials | Cost Shares
If this will open up and you can see the full cost shares, see if there is an item somewhere that is called 2x and has a BOM - especially if it appears as a grand-child of itself.
-Rob