Hi guys,
Hope that you are doing well.
This is more of a theoretical question about the "under delivery" parameter in Procurement and sourcing.
I am not a procurement specialist, but recently i had to step in into this.
Long story short - we disabled the under delivery option in the beginning of the project and therefore we do not allow under delivery and product receipts cannot be generated if users try to use "close for receipt".
Now i figured out what are my options, but i am wondering if there is another way.
Is there other way besides:
1. Controlling this on product level.
2. Changing the under delivery on line details level
Option 1: Will require extensive research and discussions because we have many products (idea was to put everything on 100% under delivery, but i don't see this as a legit option).
Option 2: Requires changes in the security, trainings and so on.
So basically can i control this under delivery percentage let's say with "Measure of units" setup of Purchasing policy of some sort ?
Any ideas are much appreciated.
Consider that we may even put the same under delivery percentage for all products.
Thank you in advance.
Simeon