Hi,
Generally in Production Floor Execution (PFE) we can see all operation from route, one operation in PFE = one operation number in route from planned prodution orders.
We can register all of operations with good quantity, scrap etc.
Assuming that each operation (one route) is performed on a different production position, it is ok.
But if I had several activities at one production place(one route), for example: assembling two parts, inserting them into the housing, gluing.
And for each of these activities, I would like to register a time with PFE.
It's possibe create one route where I can register several activities in PFE?