Answered

Cost calculation for Setup time

(0) ShareShare
ReportReport
Posted on by 200

Dear Dynamics Community:

I have a production order which has 2 operations (in route) and in the route  I defined both Setup time & Runtime  and its corresponding cost. Please see screen shot below.

Opn1.jpg

Opn2.jpg

I have Also defined Costing sheet for Indirect Labor Overhead.  (also for materials but there is no issue with materials overhead).  Please see screenshot of my costing sheet.

ILOH.jpg

I am facing this issue.  The cost for setup time is divided into 2 since only half of the time was used in the calculation. Another issue is that the Indirect Labor only considers cost in reference to the Run Time.  The calculation not include the setup time at all event though this costing sheet is linked to the cost category where both setup time and run time is  linked linked to the Route.  Please see calculation details form

pricecalc.jpg

Please note that the status of the production order is already Ended and no other issue encountered from Estimate status to Ended status.

Please advise why it happened for the Direct Mfg Cost - Setup component and Indirect Cost also for Setup component.

Thanks,

Reign

 

I have the same question (0)
  • Verified answer
    Rahul Mohta Profile Picture
    21,042 on at

    to include cost or not is determined in route groups

    pastedimage1594720604403v1.png

  • Reign Profile Picture
    200 on at

    Hi Rahul,

    Thanks, noted for the Route group setting.  Actually my setting already includes both setup and runtime.    The calculation included both Setup and Runtime cost but r for Setup time, the quantity used was split into 2.

    The issue is why the system split the value for SETUP time.  In the screen shots provided, Opn 1 uses 0.35 setup time but the calculation uses 0.17 and Opn 2 uses  0.10 setup time but uses only 0.05.  I would like to understand what have I missed.   For runtime the resulting cost use the time * cost defined in the route correctly.

    When I use another item to produce this issue does not happen.

  • Reign Profile Picture
    200 on at

    Hi Rahul,

    Upon checking, I found out that Setup Qty is charge once per 1 pc of production.  As setup happens once only regardless of qty to produce.  When I changed the qty of production to 2 hence the setup time was split into 2 and 3 pcs will split into 3.

    Thanks Rahul!

  • Suggested answer
    Rahul Mohta Profile Picture
    21,042 on at

    gr8 it worked

    pls help us marking our responses as resolved

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Introducing the 2026 Season 1 community Super Users

Congratulations to our 2026 Super Stars!

Meet the Microsoft Dynamics 365 Contact Center Champions

We are thrilled to have these Champions in our Community!

Congratulations to the March Top 10 Community Leaders

These are the community rock stars!

Leaderboard > Supply chain | Supply Chain Management, Commerce

#1
Mallesh Deshapaga Profile Picture

Mallesh Deshapaga 287

#2
Laurens vd Tang Profile Picture

Laurens vd Tang 212 Super User 2026 Season 1

#3
Syed Haris Shah Profile Picture

Syed Haris Shah 145 Super User 2026 Season 1

Last 30 days Overall leaderboard

Product updates

Dynamics 365 release plans