Dear Dynamics Community:
I have a production order which has 2 operations (in route) and in the route I defined both Setup time & Runtime and its corresponding cost. Please see screen shot below.


I have Also defined Costing sheet for Indirect Labor Overhead. (also for materials but there is no issue with materials overhead). Please see screenshot of my costing sheet.

I am facing this issue. The cost for setup time is divided into 2 since only half of the time was used in the calculation. Another issue is that the Indirect Labor only considers cost in reference to the Run Time. The calculation not include the setup time at all event though this costing sheet is linked to the cost category where both setup time and run time is linked linked to the Route. Please see calculation details form

Please note that the status of the production order is already Ended and no other issue encountered from Estimate status to Ended status.
Please advise why it happened for the Direct Mfg Cost - Setup component and Indirect Cost also for Setup component.
Thanks,
Reign