@Josh Anglesea
Hi team
Is it possible using BC and Microsoft Flow to design a flow to obsolete the part.
For example someone initiate the flow form Item Card in BC then
1) Flow send email send to engineering to approve it.
2) in the same flow: after engineering approval email goes to Inventory and ask them to remove the item from inventory.
3) in the same flow: Inventory complete the task in flow and then
4) Flow goes back to BC and Block the item and that finish the process?
Thanks for your help