Hi Everyone,
we are having an issue with 'pending issue' items just going to la-la land it seems. In Manufacturing we build a picklist (doesn’t matter what) and it has multiple components on it. we then print the picklist for those items and go to the shelf to pick them. All are good but let’s say 1 item that requires 10 and GP inventory says 10 are available but we go to pick them and only find 9. So we come back to component transaction entry and change to 9 and post the pick document. It seems this 1 not assigned gets marked as pending issue and goes to la-la land. Is this a common issue or something you have heard of? It has happened multiple times and can be reproduced.
*This post is locked for comments
I have the same question (0)