I have version 7.0 SP2 (7.02.21010.00).
AP/PR Closed fin. GL Closing runs 3hrs 5min and ends with a timeout.
Closing General Ledger:
================================================================================
System Message 10225: Timeout occurred when attempting to access database
resources - press OK to retry
System Message 6130: Fatal error. Process must be stopped at this time.
System Message 6129: Last item(s) processed: , , , ,
================================================================================
*This post is locked for comments