Suggested Answer

Multi-level explosion in Planning Optimization

(2) ShareShare
ReportReport
Posted on by 8

Hello everyone,

I am facing an issue with Planning Optimization in D365 Finance and Operations related to the BOM/formula multi-level explosion.

I am using a formula that contains only raw materials (no semi-finished items, no co-products, no by-products, no phantom items).

All coverage settings, BOM versions, site validation, and formula activation have been verified.

However, I am experiencing the following behavior:


  • When I run Planning Optimization, the system creates a planned order for the finished good, but does not explode the lower levels of the formula (level 1 and level

  • When I open production order for the finished good and perform a manual explosion (Calculate), the system correctly generates the purchase requirements for all raw materials.

So the manual explosion works correctly, but Planning Optimization does not perform the multi-level explosion automatically during the master planning run.

Has anyone encountered this issue?

Is this a known limitation, a missing configuration, or related to Planning Optimization behavior with multi-level formulas?

Any guidance or confirmation from the community would be very helpful.

I have the same question (0)
  • Suggested answer
    Lennart Lauterbach Profile Picture
    111 on at
    Hi,
     
    There is a parameter "Include all BOM levels" when you start Planning optimization:
    If you don't have a filter set on an item number, that parameter is disabled but Planning optimization is calculating all BOM levels. If you set a filter, the toggle can be edited and needs to be set to Yes manually. If you run Planning optimization from a production order explosion, that toggle is enabled by default.
  • Suggested answer
    OS-24110917-0 Profile Picture
    8 on at
    Hi

    thank you 

    I have performed all these actions and have also tried applying filters in Master Planning, but it still does not work

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Introducing the 2026 Season 1 community Super Users

Congratulations to our 2026 Super Stars!

Congratulations to our 2025 Community Spotlights

Thanks to all of our 2025 Community Spotlight stars!

Leaderboard > Supply chain | Supply Chain Management, Commerce

#1
Mallesh Deshapaga Profile Picture

Mallesh Deshapaga 254

#2
Laurens vd Tang Profile Picture

Laurens vd Tang 188 Super User 2026 Season 1

#3
André Arnaud de Calavon Profile Picture

André Arnaud de Cal... 131 Super User 2026 Season 1

Last 30 days Overall leaderboard

Product updates

Dynamics 365 release plans