Skip to main content

Notifications

Announcements

No record found.

Microsoft Dynamics GP (Archived)

Adding a per cent of Total Cost to Manufacturing Order

Posted on by 60

Running GP manufacturing.  Would like at add to the Cost of every item additional overhead to cover costs not directly associated with the manufacturing of the item but which we would like to include in our profitability analysis for each item.  This would included post-manufacturing things like warehousing,  Intra-company transportaion, manufacturing machine repair and maintenance etc.

Would be perfectly happy to add a flat 10% to the total manufacturing cost of each item to cover this amount but can figure away of doing that in the MO

Thanks in advance for any ideas

Jerry Mehler

 

  

*This post is locked for comments

  • Frank Hamelly | MVP, MCP, CSA Profile Picture
    Frank Hamelly | MVP... 4,029 Super User 2024 Season 2 on at
    Re: Adding a per cent of Total Cost to Manufacturing Order

    So you want to add 10% to the actual manufacturing cost of that specific order?  That would require a customization.

  • Jerry Mehler Profile Picture
    Jerry Mehler 60 on at
    Re: Adding a per cent of Total Cost to Manufacturing Order

    Hi Frank

    Thanks for your prompt reply but it doesn't help me at all.  

    What my client wants to do is after the entire manufacturing process is completed and all direct costs have been calculated add 10% of the total cost of producing 1 unit to the cost basis of the item produced.  The goal being to most accurately calculate  the profitability of an item by including some somewhat indirect cost such as warehousing in the cost basis for the item

    One idea a was thinking of was to add a final routing step that would add 10% to the value of the item but I can't figure out how to do that

  • Frank Hamelly | MVP, MCP, CSA Profile Picture
    Frank Hamelly | MVP... 4,029 Super User 2024 Season 2 on at
    Re: Adding a per cent of Total Cost to Manufacturing Order

    Jerry, overhead is applied at the Labor or Machine level.  See Manufacturing>>Cards>>Labor/Machine OH.

    Hope this helps,

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

December Spotlight Star - Muhammad Affan

Congratulations to a top community star!

Top 10 leaders for November!

Congratulations to our November super stars!

Tips for Writing Effective Suggested Answers

Best practices for providing successful forum answers ✍️

Leaderboard

#1
André Arnaud de Calavon Profile Picture

André Arnaud de Cal... 291,280 Super User 2024 Season 2

#2
Martin Dráb Profile Picture

Martin Dráb 230,235 Most Valuable Professional

#3
nmaenpaa Profile Picture

nmaenpaa 101,156

Leaderboard

Featured topics

Product updates

Dynamics 365 release plans