Resource (employee) time captured against a work centre

(1) ShareShare
ReportReport
Posted on by 52

Hi

I would like to book employee time against a work centre and machine to see their performance in the production line and to cost that work centre with their time.  Is that possible?

I have read to make the employee a machine - not sure if that will work - I have 10 work centre which they need to book time against any of the 10 work centre.

How can I capture time of employee against a production order please?

Thank you for your time.

Jacqui

I have the same question (0)
  • Suggested answer
    JAngle Profile Picture
    152 on at

    You could use machine centres instead. Depending on planning method you could add to the routing of the production order or have specific routings per employee. Any machine centre can be added as capacity used if you add it using the capacity journal.

    Another plan could be to have a dimension which is code mandatory against the finished goods item. When posting a journal transaction it will error unless the dimension is assigned

  • Suggested answer
    Community Member Profile Picture
    on at

    Hello,

    Adding to what Josh replied... Yes, Machine Centers are the way to go and record their time during Output entry of Machine Centers and also if you move to Shop Floor (APP) time can be entered with Start and Stop abilities against the Production Order and compare Budget to Actual.

    Thanks,

    Steve

  • Jason Nicolaou @ Sikich Profile Picture
    120 on at

    If you truly need to segregate the machine and the employee then you may consider building your routes in parallel so that each operation will have 2 machine centers.  Inside of BC it will look like 2 operations being performed at the same time, but it will be tracking your employee's time and costs along with the time and costs for the machine center.  You will need some automation if you want the operator to only make 1 entry.  Otherwise they will have to record their time AND the machine center's time that was consumed by the production order.

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Introducing the 2026 Season 1 community Super Users

Congratulations to our 2026 Super Stars!

Meet the Microsoft Dynamics 365 Contact Center Champions

We are thrilled to have these Champions in our Community!

Congratulations to the March Top 10 Community Leaders

These are the community rock stars!

Leaderboard > Small and medium business | Business Central, NAV, RMS

#1
OussamaSabbouh Profile Picture

OussamaSabbouh 1,993 Super User 2026 Season 1

#2
YUN ZHU Profile Picture

YUN ZHU 1,116 Super User 2026 Season 1

#3
Khushbu Rajvi. Profile Picture

Khushbu Rajvi. 557 Super User 2026 Season 1

Last 30 days Overall leaderboard

Featured topics

Product updates

Dynamics 365 release plans