Hello Experts,
I'm encountering an issue with production job scheduling. I've set up an automatic batch job for job scheduling, with parameters as shown in the screenshot below.
My requirement is that the job should always shchedule in forward direction from Today and with current time for that I also have done the setup as below screen.
However, when the batch job runs, it doesn’t pick up the correct time. For example, the batch job ran at 9:51 PM on 27-Oct-2024, but the scheduled jobs are starting from 9:00 AM.
If anyone has encountered this or the issue, please reply.
Thanks.