My questions is.... I need to run the Value List Report but I need it to stop on May 31. Is there a way to do this?
Thanks,
Michelle
*This post is locked for comments
My questions is.... I need to run the Value List Report but I need it to stop on May 31. Is there a way to do this?
Thanks,
Michelle
*This post is locked for comments
If you have 2.0.0150 or higher, one can run the Inventory Valuation report on specific dates.
André Arnaud de Cal... 291,431 Super User 2024 Season 2
Martin Dráb 230,503 Most Valuable Professional
nmaenpaa 101,156