When I run a BOM for a component item such as bulk or wip I get an "s" next to the item number on the assembly posting journel. Then when I run a BOM for a FG item that contains that bulk or wip I get an "s" next to the finished goods item and the bulk/wip item.
Can someone explain this to me? We do not do subassemblies when we run a BOM. However as I understand it the "s" means a subassembly was run.
*This post is locked for comments