Client has a coil of steel, that can vary in weight due to the thickness of when it was rolled. It has a + and - tolerance and can be different every time. The base unit of measure is in LBS. I have seen discussion on having to create a unique UOM to get an exact conversion. That is what we have done and everything works great on the issue of the components. The problem we are having is the receipt of the MO to create the FG. We told the MO to make 2 coils from 1 coil, when we receive the MO it wants to add 2 lbs. instead of 2* the correct UOM which in this case = 5250lbs, so it should be adding 10,500 lbs. when the order is done. This is due to the Base unit of measure for the FG item defaulting to lbs. and cannot be changes and the Qty. to Build cannot be anything other than a 1. Is there a way to change the Base unit of measure on the BOM or is there another way of handling this.

Joe

*This post is locked for comments

I have the same question (0)
  • Richard Wheeler Profile Picture
    75,848 Moderator on at
    RE: UOM

    Can you send a screenshot of how your U/M is setup for this item.

    What you should have is Base U/M = 1 which is LBS and it will create the first U/M of LBS Qty 1 Equiv is LBS

    then the next line would be COIL Qty 5250 Equiv LBS

    so when you tell it to use COIL it will convert the qty of COIL to 5250.

  • Joe Critchlow Profile Picture
    1,145 on at
    RE: UOM

    I am having a difficult time sending screenshots, I tried to paste it from word, and I try to add a picture, but it tells me they are too big.

  • babubaskaran@outlook.com Profile Picture
    12 on at
    RE: UOM

    Hi Joe,

    Can you share the screen shot of your BOM.  If I understand correctly your BOM A should manufactured using component B which qty 1 but wanted to receive qty 2 when you complete the MO.

  • babubaskaran@outlook.com Profile Picture
    12 on at
    RE: UOM

    Hi Joe,

    Please press use rich formatting just below the typing field in order to attach the screen shot

  • Suggested answer
    Redbeard Profile Picture
    12,931 on at
    RE: UOM

    Joe,

    Take a look at this blog post on assigning default UOM for various transactions in GP.  It also contains a link to a good post on creating UOM schedules.

  • Joe Critchlow Profile Picture
    1,145 on at
    RE: UOM

    Here is a screenshot of the UOM Schedule, the two UOM that are called 15030212 is the 12 size and the 15030224 is the 24 size. Below that is a screenshot of the BOM

    When I click on the top Item (FG) I can change that UOM and that is what is messing up the MO Receipt.

    The issue is working just fine, it pulls the right amount of lbs based on the UOM schedule conversion.

  • Joe Critchlow Profile Picture
    1,145 on at
    RE: UOM

  • Joe Critchlow Profile Picture
    1,145 on at
    RE: UOM

    It just will not do the screenshots

  • babubaskaran@outlook.com Profile Picture
    12 on at
    RE: UOM

    Joe,

    I cant see your screen shot have you used rich formatting and insert picture using the insert button.

  • Joe Critchlow Profile Picture
    1,145 on at
    RE: UOM

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Responsible AI policies

As AI tools become more common, we’re introducing a Responsible AI Use…

Abhilash Warrier – Community Spotlight

We are honored to recognize Abhilash Warrier as our Community Spotlight honoree for…

Leaderboard > 🔒一 Microsoft Dynamics GP (Archived)

Last 30 days Overall leaderboard

Featured topics

Product updates

Dynamics 365 release plans