RE: What is Costing Resource in Route Details
Hi,
The "costing resource" field under route details is used to specify the resource that is associated with a particular operation on a production route. A production route defines the sequence of operations required to manufacture or process an item.
The costing resource represents the specific resource or machine that will be utilized to perform the operation. It could be a piece of equipment, a work center, a labor resource, or any other type of resource that is involved in the production process.
By assigning a costing resource to an operation, you are indicating which resource will be responsible for performing that particular step in the production process. This information is essential for accurate cost calculations and resource planning. It allows the system to track the consumption of resources and calculate the cost of producing an item based on the usage of the assigned resources.
The costing resource field is typically set up and managed in the system's resource management functionality. You can define various attributes for each costing resource, such as capacity, efficiency, and cost rates. These attributes help determine the cost and time associated with the operations performed by the resource.
Overall, the costing resource field in route details enables you to link the appropriate resource to each operation on a production route, facilitating cost estimation, resource allocation, and analysis of production costs within Dynamics 365 for Finance and Operations.
Best regards,
Siv Sagar