Here's a quick tip if you're having trouble getting material cost to rollup in a Manufacturing Bill of Material. Make sure every component in the BOM has a Periodic Valuation method assigned to it. Just one component in the BOM with valuation other than Periodic could prevent materials from rolling up in the BOM, even though Labor & Overhead might rollup just fine.
gptip42day - Standard Cost Rollup and Revalue
This was originally posted here.
*This post is locked for comments