Thank you for the blog. This was very helpful
 
I have created a routing guide and route plans to calculate the route rate. The system is showing me the correct value when I click on the rate route on the outbound load planning workbench and enter the zip codes.
 
However, when I check the maintain charges once the load is shipped the charges are not showing correctly. It shows 2 lines of freight charges.
 
Could you please help.
 
Thank you