Configuration and usage of planning optimization in Microsoft Dynamics 365 Finance and Operations

Rahul Mohta Profile Picture Rahul Mohta 21,026

Configuration and usage of planning optimization in Microsoft Dynamics 365 Finance and Operations

https://docs.microsoft.com/en-us/dynamics365/supply-chain/master-planning/planning-optimization/planning-optimization-overview

Improved performance

Planning Optimization can be used in scenarios that involve long-running master plans. It's specifically designed for very fast calculations that involve very large volumes of data. Because it's built as a hyper-scalable multitenant service, multiple instances can work together simultaneously to calculate the plan. Additionally, the planning service removes the load of master planning from your system and works with a data stream that minimizes the server load.

Planning Optimization can help you achieve the following goals:

  • Improve planning performance through a shorter runtime.
  • Reduce the impact on other processes during the master planning run.
  • Do more frequent planning runs. (You aren't limited to daily runs.)
  • Be confident that future business growth won't overload the planning system.

Architecture and data flow

When the Planning Optimization Add-in is installed from LCS, a secure connection to the Planning Optimization service is established. The service is located in the same data center country or region as the related Supply Chain Management instance. After Planning Optimization is set up, when master planning is run, master data and transactional data are sent from Supply Chain Management to the Planning Optimization service.

If the Planning Optimization Add-in is uninstalled, all related data in the Planning Optimization service is removed.

High-level data flow for regeneration runs

  1. The Supply Chain Management client sends a signal to request a planning run from Planning Optimization.
  2. Planning Optimization requests the required data via the integrated connector.
  3. The SQL database sends the requested information about setup, master, and transactional data to Planning Optimization via the connector. The connector translates information between Supply Chain Management and the Planning Optimization service.
  4. The Planning Optimization service holds planning-related data in memory and does the required calculations.
  5. The planning result is sent to the Supply Chain Management database via the connector. The results include information such as planned orders and pegging information. Planning Optimization sends a signal to Supply Chain Management to indicate that the planning run has been completed. It also sends any relevant messages and warnings.

The following illustration shows the data flow.

pastedimage1603275255506v1.png

Ensure after installing add in for planning optimization, it is enabled in parameters and with status as connected

pastedimage1603275350587v2.png

next time you run MRP, it would show as planning opitmization

pastedimage1603275444849v3.png