Production order with forward flushing method

(6) ShareShare
ReportReport
Posted on by 555
Hi all,
 
I have setup the flushing method as forward in all items. I also tried to setup flushing method as forward for raw material and manual for finished goods, but I have the same result as below.
 
When I changed the status of production order to forward, what I expected is that there should be only consumption entries in Item ledger entries.
However, there is an output entry as well.
 
Have anyone had any idea?
 
 
I have the same question (0)
  • Suggested answer
    OussamaSabbouh Profile Picture
    6,876 on at
    Hello ,
     
    This is expected behavior. The Flushing Method only controls component consumption, not output. With Forward flushing, components are automatically consumed when the production order is finished, but an Output entry for the finished item is always posted—there is no flushing method for output in Business Central. Output is mandatory to create inventory, clear WIP, and calculate costs. So seeing both consumption entries and an output entry when finishing a production order is standard and correct.
     
    Regards,
    Oussama Sabbouh
  • Suggested answer
    YUN ZHU Profile Picture
    95,987 Super User 2025 Season 2 on at
  • Suggested answer
    Dhiren Nagar Profile Picture
    397 on at
    Hi,
     
    When you use Flushing method as Forward for all the output items defined in Production order, system auto posts all the consumption when you release the production order.
    Now if you have defined the last Routing line's work center with flushing method as forward then it will also post output for that production order, because last routing line generates output and if you keep that work center with Flushing method forward it auto books output.
     
    Follow the below steps:
    Set up Flushing method as Forward on Output Item, Setup flushing method on work center as Manual.
    Check the new case it should only post consumption and not output.
     
    Regards,
    Dhiren.
  • Suggested answer
    Ben Baxter Profile Picture
    6,651 Super User 2025 Season 2 on at
    The Item and Component Line Flushing method determines when the Consumption entries occur.  With Forward Flushing it happens when the Production Order is changed to Released Status, and slightly different when Routing Link Codes are involved.
     
    The Output entry is occurring because your last Operation has a Work Center with a Flushing Method set.  Simply changing your Work Center's Flushing Method to Manual will stop the auto-output of the Finished Good.
     
    You do not need to worry about the Flushing Method defined on the Finished Good's Item Card, with the exception of it being a sub-assembly that is consumed on another Production Order.
     
    Hope this helps straighten out what is happening.
     
    Best Regards,
    Ben Baxter
    Accent Software Inc

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

News and Announcements

Season of Giving Solutions is Here!

Quick Links

Responsible AI policies

As AI tools become more common, we’re introducing a Responsible AI Use…

Neeraj Kumar – Community Spotlight

We are honored to recognize Neeraj Kumar as our Community Spotlight honoree for…

Leaderboard > Small and medium business | Business Central, NAV, RMS

#1
OussamaSabbouh Profile Picture

OussamaSabbouh 1,810

#2
Khushbu Rajvi. Profile Picture

Khushbu Rajvi. 810 Super User 2025 Season 2

#3
YUN ZHU Profile Picture

YUN ZHU 676 Super User 2025 Season 2

Last 30 days Overall leaderboard

Featured topics

Product updates

Dynamics 365 release plans