Posted on by 16

Product: Dynamics 365 Business Central 28.3 (SaaS) Functional area: Projects — Project Journal posting Type: Data integrity — partial posting without error Environment used for reproduction: Sandbox, fresh copy of the customer production environment

When posting a Project Journal batch containing item lines, a subset of the lines is posted to inventory but not to the project. Item Ledger Entries are created, the corresponding Project Ledger Entries are not.

The posting completes normally: no error, no warning, no message of any kind.

Because the affected planning lines still show quantity left to post, users repeat the transfer-and-post cycle. Each repetition posts a further random subset to the project — and re-consumes inventory for the lines that keep failing. In our reproduction, clearing a single project task required five consecutive cycles, during which 128 units passed through posting against a planned quantity of 111.

The failing subset is not deterministic and is not a property of the item: an item that fails in one cycle posts successfully in the next.

 

Steps to reproduce

  1. Open a project task whose planning lines have never been posted and which shows a non-zero Remaining (Total Cost).

  2. Open Project Planning Lines, filter on Qty. to Transfer to Journal > 0, select all lines, run Create Project Journal Lines into a dedicated empty batch.

  3. Verify the generated journal total equals the task residual. It always does.

  4. Post the journal batch. No error is raised.

  5. Compare Item Ledger Entries and Project Ledger Entries created by the posting.

  6. Return to the project task and check Remaining (Total Cost).

 

Expected: every journal line produces both an Item Ledger Entry and a Project Ledger Entry; residual becomes 0 after one cycle.

 

Actual: Item Ledger Entries are created for all lines; Project Ledger Entries are missing for a subset. Residual remains non-zero. Repeating steps 2–6 clears a further random subset each time.

2.png
1.png
I have the same question (0)

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Season of Sharing Community Challenge Winners!

Congratulations to our community stars!

Women in Power Builds Momentum

Expanding mentorship, skilling, and AI innovation

Congratulations to the July Top 10 Community Leaders

These are the community rock stars!

Leaderboard > Small and medium business | Business Central, NAV, RMS

#1
OussamaSabbouh Profile Picture

OussamaSabbouh 518 Super User 2026 Season 2

#2
YUN ZHU Profile Picture

YUN ZHU 362 Super User 2026 Season 2

#3
Grigorios Mavrogeorgis Profile Picture

Grigorios Mavrogeorgis 327 Super User 2026 Season 2

Last 30 days Overall leaderboard

Featured topics

Microsoft Training Manuals

Product updates

Dynamics 365 release plans