I have never understood why BC allows GL entries and project ledger entries for Items when consuming items on projects but does not allow the same with Resources. It only creates project ledger entries. At clients I have worked with have always stated that payroll journals are required to offset against the resources consumed on a project and surely its time that option is allowed on BC as a configuration. If items can post to the GL and to the project ledger entries then surely it should so the same for Resources. I don't really understand why this option is not available.

Report
All responses (
Answers (